Diathonite Thermostep.060

Eco-Tech Building Solutions

Diathonite Thermostep.060

Diathonite Thermostep.060 (formerly Diathonite Screed) is a lightweight insulating screed made with cork, clay and diatomaceous earth. At λ 0.060 W/mK it breaks the thermal bridge through a floor. Hand...

Diathonite Thermostep.060 (formerly Diathonite Screed) is a lightweight insulating screed made with cork, clay and diatomaceous earth. At λ 0.060 W/mK it breaks the thermal bridge through a floor. Hand or machine applied from 3 cm, on concrete slabs and foam-glass aggregate, with the finished floor built above. Breathable, so trapped moisture escapes instead of condensing; compressive class C7.

Key Features

  • R 0.167 m²K/W per centimetre
  • Hand or plastering-machine application
  • Fire class A1fl
$285.90

$19.12/ft² material cost (covers ~15 ft² at 30 mm thick)

How many bags do you need?

Thickness

Enter your area to see the bag count.

Size

Made to Order · 4–6 weeks lead time
Secure checkout
Free shipping on orders $1000+
Expert support

Technical Details

Specifications

Technical Performance

Product specifications

Technical Documents

7 documents

Key Features

Product highlights

Application

How to apply

Coverage & Yield

Application rates

FAQs

Common questions

Product Brochure

Download PDF

Technical Performance

Sizes 25 kg
Yield 6.00 kg/m² per cm (± 10%)
Thickness Minimum 30 mm; maximum 50 mm per single cast (thicker builds in further coats of ≤ 50 mm each)
Application temperature +5°C to +30°C
Shelf life 12 months
Drying time ≈ 28 days at 5 cm thickness (23°C / 50% RH)
Working time ≈ 30–40 minutes application time (may vary)
Thermal conductivity (λ) 0.060 W/mK
Vapour permeability (µ) 4
Reaction to fire Class A1fl
Standard EN 13813:2002 (CE); BS EN 13813:2002 (UKCA)

Technical Documents

  • Diathonite Screed Technical data sheet

    Download
  • Diathonite Screed Technical specification

    Download
  • Diathonite Screed LEED WELL

    Download
  • Diathonite Screed Declaration of performance EN 13813 CE

    Download
  • Diathonite Screed Declaration of performance EN BS 13813 UKCA

    Download
  • Diathonite Screed Safety data sheet

    Download
  • EPD Verification for Diathonite Evolution, Diathonite Acoustix, Diathonite Acoustix+, Diathonite Deumix+, Diathonite Screed, Diathonite Thermactive.037, Diathonite Sismactive

    Download

Key Features

  • R 0.167 m²K/W per centimetre
  • Hand or plastering-machine application
  • Fire class A1fl

Application

  • Trowel
  • Plastering Machine
  • Coverage & Yield

    Yield: 6.00 kg/m² per cm (± 10%)

    Thickness: Minimum 30 mm; maximum 50 mm per single cast (thicker builds in further coats of ≤ 50 mm each)

    Figures are planning estimates; actual use varies with substrate texture, application method and technique.

    Frequently Asked Questions

    What is Diathonite Thermostep.060 used for?
    It's an insulating floor screed for homes, public buildings, hotels and conference rooms, on existing floors and new builds.

    Can it be used with radiant heating?
    Yes, on top of it. The heating pipes can't go inside Diathonite Thermostep.060, but radiant heating can go on top: the screed sits under the heating, where it limits heat loss downward.

    How thick should it be applied?
    Minimum 40 mm. Maximum 5–6 cm per layer. Can be applied in multiple layers if needed.

    Do I need a primer?
    It depends on the substrate.
    Concrete and brick need no primer.
    Over wood or steel, lay galvanized mesh (or Polites AR 330) and prime with Aquabond, at any thickness.

    How is it installed?
    By hand or by screed machine. Mix it in a mixer or with a mixing drill for no more than 3 to 4 minutes.

    Is it fire-resistant?
    Yes. Its declared fire class is A1fl.

    Can I walk on it immediately after application?
    No. It's walkable after 2 to 3 days at 23 °C and 50% RH, and dries in about 28 days at 5 cm.

    What floor can go over it?
    Tile goes on once the screed is waterproofed with an EN 14891 product, with WATstop to prep the surface where it needs it. Glued parquet waits at least 28 days.

    Product Brochure

    Need Expert Guidance?

    Our team is here to help with product selection and technical questions.

    Share Your Experience

    Be the first to share your project story. Your experience helps others on their journey.